BACK TO COMMAND OVERVIEW
|
DOSSIER:prj-fatehpura-01
|PILOT-UD-01-FATDEPLOYMENT|DCI-VFY-RJ-2024-UD01
PERIOD: Q3 2024
Fatehpura Circle / Bedla Road Junction, Udaipur, Rajasthan[24.6143° N, 73.6874° E]
Fatehpura AI Traffic Signal Pilot
Autonomous edge-actuated adaptive signal pilot deployed on one of Udaipur's most congested arterial roundabouts connecting Old City with industrial and tourist corridors.
MUNICIPAL CLIENT AUTHORITY
Udaipur Smart City Limited (USCL) / Traffic Police Udaipur
DEPLOYMENT CONTEXT
Smart City ITMS Infrastructure Pilot Initiative
DEPLOYED CAPABILITIES
Edge Computer VisionQueue Length DetectionAdaptive Signal OverrideHeterogeneous Traffic Classification
AUDITED OPERATIONAL TELEMETRY METRICS
DEPLOYMENT|DCI-VFY-RJ-2024-UD01
Peak Queue Clearance
Real-Time
Spillback mitigated on Sukhadia Circle
Cycle Adaptation
Continuous
Cycle-by-cycle adaptive rebalance
Hardware Uptime
99.82%
Zero thermal throttling recorded
Edge Inference
< 14.2ms
On-box TensorRT inference
EDGE HARDWARE PLATFORM
POLE CABINET MOUNTEDCONTROLLER COMPUTATION
Ruggedized DIN-rail Edge AI Compute Box (Dual NPU 32 TOPS)
INGRESS & ENCLOSURE
IP67 Weatherproof Aluminum Heat Sink Enclosure
THERMAL ENVELOPE
-10°C to +65°C Passive Dissipation (No active fans)
INFERENCE LATENCY
< 14.2 ms end-to-end frame perception
FAILSAFE TRIP MECHANISM
Hardware watchdog timer triggering mechanical relay bypass to fixed-time flashing amber in < 80ms upon system halt
OPTICAL SENSOR TOPOLOGY
MULTI-STREAM IPCAMERA LOADOUT
4x High Dynamic Range 4MP IP RTSP Telephoto Cameras
FOCAL OPTICS
6mm - 12mm Varifocal Optical Assemblies
DETECTION RANGE
15m - 120m corridor visibility per approach
NIGHT / LOW-LUX SENSITIVITY
True WDR 120dB with dedicated 850nm IR array for low-lux night perception
Controlled Phase Structure & Dynamic Splits
IRC:SP:87 multi-ring dual-barrier signal phasing configuration deployed at intersection.
P122s - 55s adaptive
North Approach (Bedla Road Arterial)
CONTROLLED APPROACHES
- >Northbound through
- >North-West slipway
P225s - 65s adaptive
South Approach (Sukhadia Circle Inbound)
CONTROLLED APPROACHES
- >Southbound heavy mixed
- >South-East arterial
P318s - 38s adaptive
East / West Cross Flow & Rotary Weaving
CONTROLLED APPROACHES
- >Fatehpura Bazar lane
- >Syphon cross link
RESTRICTED AUDIT-GRADE TELEMETRY // GOVERNMENT PROTOCOL
Deployment data available on authorized request
Quantitative velocity vectors, law enforcement PCU counts, and certified audit logs are restricted to authorized Municipal Commissioners, Traffic Police Superintendents, and Empanelled EPC Contractors under bilateral NDA.
SECURITY: ENCRYPTED AT REST•JURISDICTION: RAJASTHAN MUNICIPAL PROTOCOLS
VERIFICATION CERTIFIED: DCI-VFY-RJ-2024-UD01
VIEW ALTERNATE VERIFIED DEPLOYMENT:Rambagh AI Traffic Signal Pilot (Jaipur)
